Boone, NC
Wurster Engineering & Construction provided the design and construction of a permanent soil nail retaining wall system for the Appalachian State University Indoor Practice Facility project. The scope included installation of soil nails, shotcrete facing, and sub-drainage systems required for long-term performance.


